Project cargo is won in planning. We start months before the cargo moves.
A transformer, a boiler, a crane section: cargo like this cannot be booked, only engineered. Our project team starts with route surveys, axle load checks, and port equipment verification, then builds a transport plan with permits, escorts, and lifting arrangements settled before mobilization.
We have moved cargo for oil and gas, power, and EPC contractors across Indonesia and beyond. On execution day, MSI supervisors are on site at loading and discharge, because a plan is only as good as the people watching it happen.
Fitur utama
Yang selalu termasuk.
Route surveys
Physical surveys of roads, bridges, and clearances before any commitment.
Permits and escorts
Oversize transport permits and police escorts arranged across jurisdictions.
Heavy lift engineering
Crane plans, lifting studies, and lashing calculations by experienced partners.
Multimodal solutions
Barge, LCT, RoRo, and modular trailer combinations engineered per piece.
On site supervision
MSI staff present at loading, discharge, and critical transit points.
Single contract
One scope, one contract, one accountable party from survey to foundation.